By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
MFM.news
  • Majalah
    • Majalah Online
    • Terkini
    • Fundamental
    • Strategi
    • Aktiviti
    • Teknikal Analisis
  • Pilihan Editor
  • Mengenai Broker
    • Broker Forex Malaysia
    • Bonus Tanpa Deposit
    • Buka Akaun Forex
    • Copytrade Forex
  • Platform Dagangan
Reading: Declassified investigation report finds Zahid changed LCS design against Royal Malaysian Navy’s wishes
Sign In
Breaking:
Hasil Bon Jerman 10 Tahun Tertinggi Sejak April
Saham Aussie Berundur daripada Penamat Rekod
Kadar Inflasi Oman Terendah Dalam 7 Bulan
Dolar Australia Meningkat Lebih Tinggi
Kadar Inflasi India Jatuh kepada 2019-Terendah
MFM.newsMFM.news
Font ResizerAa
Search
  • Majalah
    • Majalah Online
    • Terkini
    • Fundamental
    • Strategi
    • Aktiviti
    • Teknikal Analisis
  • Pilihan Editor
  • Mengenai Broker
    • Broker Forex Malaysia
    • Bonus Tanpa Deposit
    • Buka Akaun Forex
    • Copytrade Forex
  • Platform Dagangan
Have an existing account? Sign In
Follow US
© MajalahForexMalaysia - All rights reserved.
MFM.news > Blog > Berita Terkini > Declassified investigation report finds Zahid changed LCS design against Royal Malaysian Navy’s wishes
Berita Terkini

Declassified investigation report finds Zahid changed LCS design against Royal Malaysian Navy’s wishes

Last updated: August 18, 2022 1:28 am
By Fatin Zulaikha
7 Min Read
Share
SHARE

Former defence minister, Datuk Seri Ahmad Zahid Hamidi, changed the design of the littoral combat ships (LCS) from Sigma to Gowind in 2011, contrary to what the Royal Malaysian Navy (RMN) wanted.

The Report of the Government Governance, Procurement and Finance Investigation Committee (JKSTUPKK) on the construction project of six LCS, which was declassified and published on the Public Accounts Committee (PAC) portal today, said Ahmad Zahid initially agreed with RMN’s decision to choose the Sigma design from the Netherlands, after being briefed by RMN on May 26, 2011.

However, Ahmad Zahid, who was also the deputy prime minister at the time, decided to go with the Gowind design from France, less than two months later, on July 11, 2011, after a recommendation by Boustead Naval Shipyard Sdn Bhd (BNS).

According to the report, this came two days after Ahmad Zahid received a letter from BNS on July 8, 2011 recommending the selection of the Gowind design, before BNS issued a letter of intent to French subcontractor company DCNS on July 13, 2011 to begin the concept design and design evaluation process.

“The Navy Chief at the time, Tan Sri Abdul Aziz Jaafar, defended his position and consistently chose the Sigma design from the Netherlands for the construction of the LCS.

“The Navy Chief at the time, Tan Sri Abdul Aziz Jaafar, defended his position and consistently chose the Sigma design from the Netherlands for the construction of the LCS.

“This is clearly shown in the Navy chief’s letter to the secretary-general of the Ministry of Defence on August 17, 2011 and to (then) prime minister, Datuk Seri Najib Razak, on September 7, 2011,” said the report.

The report found that BNS was determined to choose the Gowind design because it had held prior discussions and negotiations with DCNS to carry out the construction of the LCS.

“This can be proved when BNS issued a Letter of Intent to DCNS on July 13, 2011, two days after (then) defence minister, Datuk Seri Ahmad Zahid Hamidi, expressed his agreement with BNS’ recommendation. In fact, BNS also started the Conceptual Design process with DCNS on July 25, 2011, which was before the original Letter of Acceptance (SST) was issued on December 16, 2011.

“The method of selecting contractors was contractor driven and also determining the selection of LCS designs was based on the recommendations of BNS and did not take into account the views of the end user which was RMN,” said the report.

The report also detailed the Defence Ministry’s 4/11 Series Equipment and Services Procurement Monitoring Committee, which convened on August 12, 2011.

It was during this meeting that BNS’ recommendation to select the Gowind design was accepted despite the Navy chief’s protestations that the ministry had not put the interests and views of RMN first.

“In his letter dated August 17, 2011, the Navy chief said to the chief secretary of the Defence Ministry that the quotation process for the CSM SETIS from DCNS had violated the Standard Practices of the International Tendering Process because previously DCNS was not listed in the original five OEMs that had been invited by BNS to submit CMS quotations.

“The Navy chief also stated that there were elements of data evaluation manipulation by the BNS Evaluation Team to give misrepresented information to the BNS board of directors. This happened during the Analysis on the BNS Evaluation for MS to RMN on July 11, 2011. The technical data for the evaluation was submitted by DCNS two months after the closing date for CMS quotations,” said the report.

Following that, the Defence Ministry made an application to the Ministry of Finance (MoF) for the issuance of an SST that set the conditions for the design of Gowind and the Setis brand combat management system (CMS) as well as 17 equipment and subsystems.

MoF approved the issuance of the SST to BNS on December 15, 2011 with a contract ceiling limit of RM9 billion, the report added.

Following that, the Defence Ministry asked MoF to make an advance payment of RM1.8 billion or 20 per cent of the contract ceiling limit, with a RM500 million advance in 2011, and the remaining advance payment to be completed in 2012.

However, MoF on December 21, 2011 only agreed to approve an advance payment of RM500 million to BNS.

The JKSTUPKK report revealed that the value of the advance payment in the SST was amended twice, with a second advance payment of RM700 million in 2013, and a third advance payment amounting to RM170 million in 2014. Only RM164.9 million was paid in January 2014.

“The total amount of advance payment at the SST level amounts to RM1,364,997,803 or 14.95 per cent of the contract value,” he said.

On August 6, Ahmad Zahid dismissed allegations linking him to the mismanagement of the LCS project.

The Umno president said he was not the defence minister at the time the project was awarded and only held the portfolio from April 2009 to May 2013.

“Those who failed in the LCS procurement must be held responsible, and they must explain the matter to the Public Accounts Committee (PAC).

“It is to support the revelation of the delay in the delivery of the project,” he was quoted as saying by Umno Online. –MALAYMAIL

Anda Pasti Sukakan Ini

BATTLE OF THE TRADER (BOTT) 2019 MINGGU KE-6

AUSTRALIA MENGUMUMKAN PAKEJ RANGSANGAN EKONOMI BERNILAI $928 JUTA UNTUK SEKTOR PELANCONGAN

Musim menuai di Kedah bantu pulih bekalan beras putih di pasaran

Aset Bank Of Japan merosot dua bulan berturut-turut

PRESIDEN MACRON MENAWARKAN ‘LE RESET’ KEPADA UK JIKA PRESIDEN BORIS JOHNSON MENEPATI JANJINYA TENTANG BREXIT

TAGGED:LCS AuditZahid HamidiZahid Hamidi LCS
Share This Article
Facebook Email Copy Link Print
Glad you finished the article! How do you feel about it?
Love0
Happy0
Surprise0
Embarrass0
Sleepy0
Sad0
Angry0
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


More like this

Perjalanan Bebas Visa Malaysia-China Bermula 17 Julai!
July 16, 2025
PM Perancis Cadang Mansuhkan Cuti Umum Untuk Kurangkan Hutang Negara
July 16, 2025
Pelabur Asing Jual Semula RM516.6 Juta Saham Tempatan, Trader Saham Beralih ke Forex Semasa Ketidaktentuan Pasaran
July 16, 2025
Hasil Bon Jerman 10 Tahun Tertinggi Sejak April
July 16, 2025
Saham Aussie Berundur daripada Penamat Rekod
July 16, 2025
- Advertisement -
Ad image

Artikel menarik untuk anda

Berita Terkini

BNM kekalkan OPR pada 2.75%

By Fatin Zulaikha
3 Min Read
Berita Terkini

Air Laut Kena Cukai 5% Mulai 1 Julai 2025?

By Ahmad Danial
5 Min Read
Berita Terkini

Dolar AS bergelut untuk mencari permintaan kerana pasaran mengintai data CPI AS

By Ahmad Danial
6 Min Read

Segalanya di Majalah Forex Malaysia

News Ticker

Hasil Bon 10 Tahun Australia Merosot Menjelang Keputusan RBA

By MFM News Update
July 3, 2025
1 Min Read

Kisah Lagenda Scammer Malaysia,Pak Man Telo

By Azawiya Azali
June 18, 2025
Berita Terkini

Rakyat Malaysia Bakal Nikmati Tarif Elektrik Lebih Adil Mulai 1 Julai 2025!

By Ahmad Danial
June 22, 2025
4 Min Read
Majalah Online

MAJALAH FOREX MALAYSIA EDISI KE 335 SEDIA UNTUK DIMUAT TURUN PERCUMA

By MFM Team
0 Min Read
- Advertisement -
Ad image
News Ticker

Rupee India Melemah Lagi

Rupee India melemah kepada 86 setiap USD pada bulan Mei, menyusut 1.5% setakat bulan ini walaupun…

By MFM News Update
May 22, 2025
News Ticker

Saham AS Goyah Selepas Minggu Tidak Menentu

Saham AS berlegar hampir kepada garis rata pada Khamis selepas minggu yang tidak menentu, kerana pasaran…

By MFM News Update
April 24, 2025
Berita Terkini

USD Melemah Membantu Ringgit Makin Mengukuh

KUALA LUMPUR, 7 Mei 2025 – Ringgit Malaysia terus menunjukkan prestasi memberangsangkan apabila mata wang tempatan…

By Fatin Zulaikha
May 7, 2025
Berita Terkini

LHDN Umum Penangguhan Pelaksanaan e-Invois untuk Usahawan Berpendapatan Bawah RM5 Juta ke Tahun 2026

Lembaga Hasil Dalam Negeri Malaysia (LHDN) telah mengumumkan penangguhan pelaksanaan sistem e-Invois bagi kategori pembayar cukai…

By Ahmad Danial
June 6, 2025
MFM.news

MFM.news adalah laman interaktif bagi komuniti forex di Malaysia, Brunei dan Indonesia. Di MFM anda boleh dapatkan informasi terkini berkaitan forex, isu semasa, dan pasaran kewangan secara amnya. Terdapat juga promosi hebat daripada forex broker di Malaysia dikongsi di laman ini.

Lain-Lain

  • Laman Utama
  • Peluang Dagangan
  • Berita Terkini
  • Belajar Forex

Korporat

  • Profil
  • Perkhidmatan
  • Majalah Online
  • Hubungi Kami

© 2025 MFM.news – All rights reserved.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?

Not a member? Sign Up